MANILA, Philippines — The Metropolitan Manila Development Authority (MMDA) has proposed the construction of rainwater impounding facilities inside Camp Aguinaldo to ease recurring flooding along EDSA, with the proposed design released on Wednesday.
The plan calls for detention ponds that will temporarily store excess rainwater during downpours and gradually release it into the EDSA drainage system leading to Makiling Creek.
According to the proposal, the project will be implemented in three phases covering 182 hectares: a golf course near Gate 2, another near Gates 3 and 4, and an open space near Gate 6.
For the first phase near Gate 2, the detention pond has a 361-meter perimeter, a 4,650-square-meter area, an 8-meter depth, and a 37,200-cubic-meter capacity, designed for a 25-year return period (15.6 mm/hr over 24 hours) and exceeding the needed 36,945 cubic meters.
MMDA’s schematic shows that under normal weather, water bypasses the pond and traverses the lagoon to EDSA; during heavy rains, floodgates divert flows into the pond; after rains, pumps discharge stored water slowly to EDSA toward Makiling Creek., This news data comes from:http://052298.com

The scope of work covers the impounding area, an operations and power house, drainage and electromechanical works, and landscaping and golf course restoration, with a treatment facility under consideration.
MMDA unveils plan to build rainwater impounding facilities in Camp Aguinaldo
Officials said operations and maintenance arrangements and a memorandum of agreement were being discussed..
- Marcos lauds Alex Eala’s win in Guadalajara
- Appointments panel holds first session
- No winner in Ultra, Megalotto draws for Aug 29
- Read to reduce sentence, Uzbekistan tells prisoners
- Pasig fire kills child, injures mother as she tries to save him
- UP journalism professor chides Rep. Gomez over ‘media spin’ claims
- Lacson: House can't return proposed 2026 budget to Palace
- Trump to blacklist countries for imprisoning Americans
- SpaceX cancels Starship megarocket launch
- Philippines nears universal healthcare, 80% goal achieved -- Marcos